EEMCS EPrints Service
|
||||||||||||||||||||||||||||||||||||||||
|
Brueggemann, T. and Hurink, J.L.
(2007)
Two very large-scale neighborhoods for single machine scheduling.
OR Spectrum, 29 (3).
pp. 513-533.
ISSN 0171-6468
*** ISI Impact 2,030 ***
Full text available as:
Official URL: http://dx.doi.org/10.1007/s00291-006-0052-5 ![]() AbstractIn this paper, the problem of minimizing the total completion time on a single machine with the presence of release dates is studied. We introduce two different approaches leading to very large-scale neighborhoods in which the best improving neighbor can be determined in polynomial time. Furthermore, computational results are presented to get insight in the performance of the developed neighborhoods.
Export this item as: To request a copy of the PDF please email us request copy To correct this item please ask your editor Repository Staff Only: edit this item |
||||||||||||||||||||||||||||||||||||||||
